ECO reference refers to the formal process of implementing change in product design components or manufacturing processes. Engineering Change Order (ECO) for Work Order Routings in Odoo.
Video Chapters
00:00 – Introduction
00:29 – Configure product and Bom
04:39 – MO
08:31 – PLM
#odoo16 #odoofunctionalvideos #odootutorials
An engineering change order (ECO) is a documentation packet that outlines the proposed change of Routing for items. document states about the new changes or the new design made to the existing products.
#odoomanufacturing
They provide you with the list of changes, new or changed components, and other related information about the proposed change
Connect With Us:
—————————————
➡️ Website:
➡️ Email: info@cybrosys.com
➡️ Twitter:
➡️ LinkedIn:
➡️ Facebook:
➡️ Instagram:
➡️ Pinterest:
#Change #ECO #Engineering #Change #Order #Odoo #Manufacturing