Change in ECO (Engineering Change Order) in Odoo 16 Manufacturing – CBMS Odoo ERP

Change in ECO (Engineering Change Order) in Odoo 16 Manufacturing – CBMS Odoo ERP

ECO reference refers to the formal process of implementing change in product design components or manufacturing processes. Engineering Change Order (ECO) for Work Order Routings in Odoo.

Video Chapters
00:00 – Introduction
00:29 – Configure product and Bom
04:39 – MO
08:31 – PLM

#odoo16 #odoofunctionalvideos #odootutorials
An engineering change order (ECO) is a documentation packet that outlines the proposed change of Routing for items. document states about the new changes or the new design made to the existing products.

#odoomanufacturing
They provide you with the list of changes, new or changed components, and other related information about the proposed change

Connect With Us:
—————————————
➡️ Website:
➡️ Email: info@mycbms.com
➡️ Twitter:
➡️ LinkedIn:
➡️ Facebook:
➡️ Instagram:
➡️ Pinterest:

#Change #ECO #Engineering #Change #Order #Odoo #Manufacturing

Similar Posts

2 Comments on Change in ECO (Engineering Change Order) in Odoo 16 Manufacturing – CBMS Odoo ERP

Leave a Reply